ABAP Select data from SAP table PPROJCOSTSTODATE into internal table

Get Example source ABAP code based on a different SAP table
  

Below is a number of ABAP code snippets to demonstrate how to select data from SAP PPROJCOSTSTODATE table and store it within an internal table, including using the newer @DATA inline declaration methods. It also shows you various ways to process this data using ABAP work area, inline declaration or field symbols including executing all the relevant CONVERSION_EXIT routines specific to PPROJCOSTSTODATE. See here for more generic Select statement tips.

Sometimes data within SAP is stored within the database table in a different format to what it is displayed to the user. These input/output conversation FM routines are what translates the data between the two formats.

There is also a full declaration of the PPROJCOSTSTODATE table where each field has a char/string type for you to simply copy and paste. This allows you to use processing that is only available to these field types such as the CONCATENATE statement.

DATA: IT_PPROJCOSTSTODATE TYPE STANDARD TABLE OF PPROJCOSTSTODATE,
      WA_PPROJCOSTSTODATE TYPE PPROJCOSTSTODATE,
      GD_STR TYPE STRING.

DATA: lo_typedescr type REF TO cl_abap_typedescr.
DATA: lv_fieldname type fieldname.

FIELD-SYMBOLS: <FIELD> TYPE any.
FIELD-SYMBOLS: <PPROJCOSTSTODATE> TYPE PPROJCOSTSTODATE.

*Process all fields in table header/work area as string values
  PERFORM process_as_string_field_values CHANGING wa_PPROJCOSTSTODATE.

SELECT *
*restrict ABAP select to first 10 rows
 UP TO 10 ROWS      
  FROM PPROJCOSTSTODATE
  INTO TABLE IT_PPROJCOSTSTODATE.

*Select data and declare internal table using in-line method @DATA
*SELECT *
*  FROM PPROJCOSTSTODATE
*  INTO TABLE @DATA(IT_PPROJCOSTSTODATE2).
*--Further methods of using ABAP code to  select data from SAP database tables

*You can also declare the header/work area using the in-line DATA declaration method
READ TABLE IT_PPROJCOSTSTODATE INDEX 1 INTO DATA(WA_PPROJCOSTSTODATE2).


*Demonstrate how to loop at an internal table and update values using a FIELD-SYMBOL
LOOP AT IT_PPROJCOSTSTODATE ASSIGNING <PPROJCOSTSTODATE>.
*To update a field value using a field symbol simply change the value via the field symbol pointer
<PPROJCOSTSTODATE>-MANDT = 1.
<PPROJCOSTSTODATE>-YEARMONTH = 1.
<PPROJCOSTSTODATE>-PROJECT = 1.
<PPROJCOSTSTODATE>-COMPANYCODE = 1.
<PPROJCOSTSTODATE>-POSTINGDATE = 1.
ENDLOOP.

LOOP AT IT_PPROJCOSTSTODATE INTO WA_PPROJCOSTSTODATE.
*Write horizonal line to screen report.
  WRITE:/ sy-uline.

*Write selected data to screen/report before conversion.
  WRITE:/ sy-vline,   WA_PPROJCOSTSTODATE-PROFITCENTER, sy-vline,
WA_PPROJCOSTSTODATE-PLANNINGCATEGORY, sy-vline,
WA_PPROJCOSTSTODATE-PROJECTUUID, sy-vline,
WA_PPROJCOSTSTODATE-PROJECTINTERNALID, sy-vline,
WA_PPROJCOSTSTODATE-GLOBALCURRENCY, sy-vline,
WA_PPROJCOSTSTODATE-PROJECTTYPE, sy-vline.
ENDLOOP. *Add any further fields from structure WA_PPROJCOSTSTODATE you want to display... WRITE:/ sy-uline. * Aternatively use generic code to Write field values (and NAME) to screen report DO. ASSIGN COMPONENT sy-index OF STRUCTURE wa_PPROJCOSTSTODATE TO <field>. IF sy-subrc <> 0. EXIT. ENDIF. WRITE:/ 'Field Value', <field>, sy-vline. gd_str = <field> . lo_typedescr ?= CL_ABAP_DATADESCR=>DESCRIBE_BY_DATA( <field> ). lv_fieldname = lo_typedescr->GET_RELATIVE_NAME( ). WRITE:/ 'Field Name', lv_fieldname. ENDDO. *Redo loop but convert all fields from internal to out value LOOP AT IT_PPROJCOSTSTODATE INTO WA_PPROJCOSTSTODATE. *Write horizonal line to screen report. WRITE:/ sy-uline. *Convert all fields to display/output versions using conversion routines PERFORM convert_all_field_values CHANGING wa_EKKO. ENDLOOP. *&---------------------------------------------------------------------* *& Form convert_all_field_values *&---------------------------------------------------------------------* FORM convert_all_field_values CHANGING p_EKKO LIKE wa_EKKO. DATA: ld_input(1000) TYPE c, ld_output(1000) TYPE C.

*Conversion exit ALPHA, internal->external for field PROFITCENTER CALL FUNCTION 'CONVERSION_EXIT_ALPHA_OUTPUT' EXPORTING input = WA_PPROJCOSTSTODATE-PROFITCENTER IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PPROJCOSTSTODATE-PROFITCENTER.
WRITE:/ 'New Value:', ld_input.

*Conversion exit ALPHA, internal->external for field PLANNINGCATEGORY CALL FUNCTION 'CONVERSION_EXIT_ALPHA_OUTPUT' EXPORTING input = WA_PPROJCOSTSTODATE-PLANNINGCATEGORY IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PPROJCOSTSTODATE-PLANNINGCATEGORY.
WRITE:/ 'New Value:', ld_input.

*Conversion exit ALPHA, internal->external for field BUSINESSPARTNER CALL FUNCTION 'CONVERSION_EXIT_ALPHA_OUTPUT' EXPORTING input = WA_PPROJCOSTSTODATE-BUSINESSPARTNER IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PPROJCOSTSTODATE-BUSINESSPARTNER.
WRITE:/ 'New Value:', ld_input.
ENDFORM. *&---------------------------------------------------------------------* *& Form process_as_string_field_values *&---------------------------------------------------------------------* FORM process_as_string_field_values CHANGING p_EKKO LIKE wa_EKKO. TYPES: BEGIN OF T_PPROJCOSTSTODATE_STR,
MANDT TYPE STRING,
YEARMONTH TYPE STRING,
PROJECT TYPE STRING,
COMPANYCODE TYPE STRING,
POSTINGDATE TYPE STRING,
PROFITCENTER TYPE STRING,
PLANNINGCATEGORY TYPE STRING,
PROJECTUUID TYPE STRING,
PROJECTINTERNALID TYPE STRING,
GLOBALCURRENCY TYPE STRING,
PROJECTTYPE TYPE STRING,
CONTROLLINGAREA TYPE STRING,
BUSINESSPARTNERFULLNAME TYPE STRING,
BUSINESSPARTNERUUID TYPE STRING,
BUSINESSPARTNER TYPE STRING,
ACTUALAMOUNTINGLOBALCURRENCY TYPE STRING,
PLANAMOUNTINGLOBALCURRENCY TYPE STRING,
AMOUNTINGLOBALCURRENCY TYPE STRING,
CALENDARMONTHNAME TYPE STRING,END OF T_EKKO_STR. DATA: WA_PPROJCOSTSTODATE_STR type T_EKKO_STR. DATA: ld_text TYPE string. LOOP AT IT_EKKO INTO WA_EKKO. MOVE-CORRESPONDING wa_EKKO TO WA_EKKO_STR. CONCATENATE: sy-vline
WA_PPROJCOSTSTODATE_STR-MANDT sy-vline
WA_PPROJCOSTSTODATE_STR-YEARMONTH sy-vline
WA_PPROJCOSTSTODATE_STR-PROJECT sy-vline
WA_PPROJCOSTSTODATE_STR-COMPANYCODE sy-vline
WA_PPROJCOSTSTODATE_STR-POSTINGDATE sy-vline
WA_PPROJCOSTSTODATE_STR-PROFITCENTER sy-vline
WA_PPROJCOSTSTODATE_STR-PLANNINGCATEGORY sy-vline
WA_PPROJCOSTSTODATE_STR-PROJECTUUID sy-vline
WA_PPROJCOSTSTODATE_STR-PROJECTINTERNALID sy-vline
WA_PPROJCOSTSTODATE_STR-GLOBALCURRENCY sy-vline
WA_PPROJCOSTSTODATE_STR-PROJECTTYPE sy-vline
WA_PPROJCOSTSTODATE_STR-CONTROLLINGAREA sy-vline
WA_PPROJCOSTSTODATE_STR-BUSINESSPARTNERFULLNAME sy-vline
WA_PPROJCOSTSTODATE_STR-BUSINESSPARTNERUUID sy-vline
WA_PPROJCOSTSTODATE_STR-BUSINESSPARTNER sy-vline
WA_PPROJCOSTSTODATE_STR-ACTUALAMOUNTINGLOBALCURRENCY sy-vline
WA_PPROJCOSTSTODATE_STR-PLANAMOUNTINGLOBALCURRENCY sy-vline
WA_PPROJCOSTSTODATE_STR-AMOUNTINGLOBALCURRENCY sy-vline
WA_PPROJCOSTSTODATE_STR-CALENDARMONTHNAME sy-vline INTO ld_text SEPARATED BY SPACE. *Add any further fields from structure WA_EKKO_STR you want to CONCATENATE... ENDLOOP. ENDFORM.