ABAP Select data from SAP table PENGPROJDMND into internal table

Get Example source ABAP code based on a different SAP table
  

Below is a number of ABAP code snippets to demonstrate how to select data from SAP PENGPROJDMND table and store it within an internal table, including using the newer @DATA inline declaration methods. It also shows you various ways to process this data using ABAP work area, inline declaration or field symbols including executing all the relevant CONVERSION_EXIT routines specific to PENGPROJDMND. See here for more generic Select statement tips.

Sometimes data within SAP is stored within the database table in a different format to what it is displayed to the user. These input/output conversation FM routines are what translates the data between the two formats.

There is also a full declaration of the PENGPROJDMND table where each field has a char/string type for you to simply copy and paste. This allows you to use processing that is only available to these field types such as the CONCATENATE statement.

DATA: IT_PENGPROJDMND TYPE STANDARD TABLE OF PENGPROJDMND,
      WA_PENGPROJDMND TYPE PENGPROJDMND,
      GD_STR TYPE STRING.

DATA: lo_typedescr type REF TO cl_abap_typedescr.
DATA: lv_fieldname type fieldname.

FIELD-SYMBOLS: <FIELD> TYPE any.
FIELD-SYMBOLS: <PENGPROJDMND> TYPE PENGPROJDMND.

*Process all fields in table header/work area as string values
  PERFORM process_as_string_field_values CHANGING wa_PENGPROJDMND.

SELECT *
*restrict ABAP select to first 10 rows
 UP TO 10 ROWS      
  FROM PENGPROJDMND
  INTO TABLE IT_PENGPROJDMND.

*Select data and declare internal table using in-line method @DATA
*SELECT *
*  FROM PENGPROJDMND
*  INTO TABLE @DATA(IT_PENGPROJDMND2).
*--Further methods of using ABAP code to  select data from SAP database tables

*You can also declare the header/work area using the in-line DATA declaration method
READ TABLE IT_PENGPROJDMND INDEX 1 INTO DATA(WA_PENGPROJDMND2).


*Demonstrate how to loop at an internal table and update values using a FIELD-SYMBOL
LOOP AT IT_PENGPROJDMND ASSIGNING <PENGPROJDMND>.
*To update a field value using a field symbol simply change the value via the field symbol pointer
<PENGPROJDMND>-MANDT = 1.
<PENGPROJDMND>-RESOURCEDEMANDUUID = 1.
<PENGPROJDMND>-FISCALYEAR = 1.
<PENGPROJDMND>-FISCALPERIOD = 1.
<PENGPROJDMND>-ENGMNTPROJPLANLINETYPE = 1.
ENDLOOP.

LOOP AT IT_PENGPROJDMND INTO WA_PENGPROJDMND.
*Write horizonal line to screen report.
  WRITE:/ sy-uline.

*Write selected data to screen/report before conversion.
  WRITE:/ sy-vline,   WA_PENGPROJDMND-RESOURCESUPPLY, sy-vline,
WA_PENGPROJDMND-ENGAGEMENTPROJECTSERVICEORG, sy-vline,
WA_PENGPROJDMND-ENGAGEMENTPROJECTCATEGORY, sy-vline,
WA_PENGPROJDMND-PROJECTPROFILECODE, sy-vline,
WA_PENGPROJDMND-ENGMNTPROJECTHEADERCOMPANYCODE, sy-vline,
WA_PENGPROJDMND-ENGAGEMENTPROJECTCOSTCENTER, sy-vline.
ENDLOOP. *Add any further fields from structure WA_PENGPROJDMND you want to display... WRITE:/ sy-uline. * Aternatively use generic code to Write field values (and NAME) to screen report DO. ASSIGN COMPONENT sy-index OF STRUCTURE wa_PENGPROJDMND TO <field>. IF sy-subrc <> 0. EXIT. ENDIF. WRITE:/ 'Field Value', <field>, sy-vline. gd_str = <field> . lo_typedescr ?= CL_ABAP_DATADESCR=>DESCRIBE_BY_DATA( <field> ). lv_fieldname = lo_typedescr->GET_RELATIVE_NAME( ). WRITE:/ 'Field Name', lv_fieldname. ENDDO. *Redo loop but convert all fields from internal to out value LOOP AT IT_PENGPROJDMND INTO WA_PENGPROJDMND. *Write horizonal line to screen report. WRITE:/ sy-uline. *Convert all fields to display/output versions using conversion routines PERFORM convert_all_field_values CHANGING wa_EKKO. ENDLOOP. *&---------------------------------------------------------------------* *& Form convert_all_field_values *&---------------------------------------------------------------------* FORM convert_all_field_values CHANGING p_EKKO LIKE wa_EKKO. DATA: ld_input(1000) TYPE c, ld_output(1000) TYPE C.

*Conversion exit GJAHR, internal->external for field FISCALYEAR CALL FUNCTION 'CONVERSION_EXIT_GJAHR_OUTPUT' EXPORTING input = WA_PENGPROJDMND-FISCALYEAR IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PENGPROJDMND-FISCALYEAR.
WRITE:/ 'New Value:', ld_input.

*Conversion exit ALPHA, internal->external for field PROFITCENTER CALL FUNCTION 'CONVERSION_EXIT_ALPHA_OUTPUT' EXPORTING input = WA_PENGPROJDMND-PROFITCENTER IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PENGPROJDMND-PROFITCENTER.
WRITE:/ 'New Value:', ld_input.

*Conversion exit CUNIT, internal->external for field UNITOFMEASURE CALL FUNCTION 'CONVERSION_EXIT_CUNIT_OUTPUT' EXPORTING input = WA_PENGPROJDMND-UNITOFMEASURE IMPORTING output = ld_input.
WRITE:/ 'Org Value:', WA_PENGPROJDMND-UNITOFMEASURE.
WRITE:/ 'New Value:', ld_input.
ENDFORM. *&---------------------------------------------------------------------* *& Form process_as_string_field_values *&---------------------------------------------------------------------* FORM process_as_string_field_values CHANGING p_EKKO LIKE wa_EKKO. TYPES: BEGIN OF T_PENGPROJDMND_STR,
MANDT TYPE STRING,
RESOURCEDEMANDUUID TYPE STRING,
FISCALYEAR TYPE STRING,
FISCALPERIOD TYPE STRING,
ENGMNTPROJPLANLINETYPE TYPE STRING,
RESOURCESUPPLY TYPE STRING,
ENGAGEMENTPROJECTSERVICEORG TYPE STRING,
ENGAGEMENTPROJECTCATEGORY TYPE STRING,
PROJECTPROFILECODE TYPE STRING,
ENGMNTPROJECTHEADERCOMPANYCODE TYPE STRING,
ENGAGEMENTPROJECTCOSTCENTER TYPE STRING,
PROFITCENTER TYPE STRING,
PROJECTVISIBILITY TYPE STRING,
ISMYPROJECT TYPE STRING,
ENGAGEMENTPROJECT TYPE STRING,
ENGAGEMENTPROJECTNAME TYPE STRING,
ENGAGEMENTPROJECTSTAGE TYPE STRING,
WORKPACKAGE TYPE STRING,
ENGAGEMENTPROJECTRESOURCE TYPE STRING,
RESOURCEDEMAND TYPE STRING,
CURRENCY TYPE STRING,
UNITOFMEASURE TYPE STRING,
DEMANDSTARTDATE TYPE STRING,
DEMANDENDDATE TYPE STRING,
DEMANDSTAFFINGSTATUS TYPE STRING,
DELIVERYORGANIZATION TYPE STRING,
DEMANDEFFORTQTY TYPE STRING,
SUPPLYEFFORTQTY TYPE STRING,
DEMANDCOSTAMT TYPE STRING,END OF T_EKKO_STR. DATA: WA_PENGPROJDMND_STR type T_EKKO_STR. DATA: ld_text TYPE string. LOOP AT IT_EKKO INTO WA_EKKO. MOVE-CORRESPONDING wa_EKKO TO WA_EKKO_STR. CONCATENATE: sy-vline
WA_PENGPROJDMND_STR-MANDT sy-vline
WA_PENGPROJDMND_STR-RESOURCEDEMANDUUID sy-vline
WA_PENGPROJDMND_STR-FISCALYEAR sy-vline
WA_PENGPROJDMND_STR-FISCALPERIOD sy-vline
WA_PENGPROJDMND_STR-ENGMNTPROJPLANLINETYPE sy-vline
WA_PENGPROJDMND_STR-RESOURCESUPPLY sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTSERVICEORG sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTCATEGORY sy-vline
WA_PENGPROJDMND_STR-PROJECTPROFILECODE sy-vline
WA_PENGPROJDMND_STR-ENGMNTPROJECTHEADERCOMPANYCODE sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTCOSTCENTER sy-vline
WA_PENGPROJDMND_STR-PROFITCENTER sy-vline
WA_PENGPROJDMND_STR-PROJECTVISIBILITY sy-vline
WA_PENGPROJDMND_STR-ISMYPROJECT sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECT sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTNAME sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTSTAGE sy-vline
WA_PENGPROJDMND_STR-WORKPACKAGE sy-vline
WA_PENGPROJDMND_STR-ENGAGEMENTPROJECTRESOURCE sy-vline
WA_PENGPROJDMND_STR-RESOURCEDEMAND sy-vline
WA_PENGPROJDMND_STR-CURRENCY sy-vline
WA_PENGPROJDMND_STR-UNITOFMEASURE sy-vline
WA_PENGPROJDMND_STR-DEMANDSTARTDATE sy-vline
WA_PENGPROJDMND_STR-DEMANDENDDATE sy-vline
WA_PENGPROJDMND_STR-DEMANDSTAFFINGSTATUS sy-vline
WA_PENGPROJDMND_STR-DELIVERYORGANIZATION sy-vline
WA_PENGPROJDMND_STR-DEMANDEFFORTQTY sy-vline
WA_PENGPROJDMND_STR-SUPPLYEFFORTQTY sy-vline
WA_PENGPROJDMND_STR-DEMANDCOSTAMT sy-vline INTO ld_text SEPARATED BY SPACE. *Add any further fields from structure WA_EKKO_STR you want to CONCATENATE... ENDLOOP. ENDFORM.